Construction of overhead power lines
 

 

Electro Him Zashita, LLC performs a full range of works for the construction of overhead power lines. Production units are equipped with modern specialized equipment for construction and assembly works. For the installation of overhead power line supports without foundations, hydraulic drilling and crane machines "БКМ-317А" are used. In the case of using complex foundations or bored piles, hydraulic drilling rigs "УБГ-С-45 Барс" are used on the basis of KamAZ-43118 all-terrain vehicles.

On low-bearing soils, as a rule, pile foundations with a depth of 8-15 meters are used for power transmission towers, installation is carried out by pile-driving machine "СП-49РН-14" with or without drilling equipment. Qualified specialists carry out high-quality installation of attached electrical equipment and wires. Our own Quality Control Service (QC) promptly monitors and verifies the completeness and quality of the work performed. And the Electrotechnical Testing Laboratory, certified for electrical tests and measurements in electrical installations up to 110 kV inclusive, timely carries out a set of acceptance tests necessary for commissioning a completed overhead power transmission line.

Направление работ