Company news

 
25.09.2024

🌏NEWS FROM THE SITES 

Specialists of the laboratory of complex technical diagnostics carry out commissioning of electrochemical protection systems at the facilities of Transneft Vostok LLC. During the execution of the work, the quality of construction and installati… читать дальше

16.09.2024

Specialists of Electro Khim Zashchita LLC have moved on to the final stage of work on the reconstruction of fences and KTSO on sections of the SOD checkpoint 383rd km and UZA 363rd km of the Aleksandrovskoye - Anzhero-Sudzhensk main line. At the moment, work is being carried out on the installati… читать дальше

01.08.2024

Specialists of Electro Khim Zashchita LLC are working in the Tomsk Region (Parabelsky and Kargasoksky Districts) to reconstruct the fences of the SOD chambers and at the shut-off valve units. At the moment, both dismantling of the old fence structures and moving of the existing embankment to the… читать дальше

24.07.2024

At the Igolsko-Talovoye–Parabel MN facility, field work is already coming to completion in conditions of special swampiness! Due to the high level of technical equipment of the Electro Chemical Protection LLC team, the process is moving faster than planned. The next stage is a preliminary technic… читать дальше

24.07.2024

This year, our company plans to carry out work on the corrosion inspection of the Igolsko-Talovoye–Parabel swampy area, for which the legendary Russian SHERP all-terrain vehicle (New name ARHANT) was purchased. The technique will show itself in action this month!

09.07.2024

В начале текущей недели состоялся выезд камеральной группы лаборатории комплексной технической диагностики на объект МНПП "Омск-Сокур", было проведено обследование СКЗ и КИП.

09.07.2024

In the north of the Tomsk region, in the village of Parabel, employees of Electro Him Zashita LLC are replacing fences at the checkpoint SOD and UZ MN Anzhero-Sudzhensk.

09.07.2024

The Sakha Republic. NPS10 Talakan. The beginning of work on drilling 19m wells for deep anodes of EHS facilities.

03.06.2024

The photo shows the installation process by our UZT workers! Location: territory of the Irkutsk Oil Company (INK) in the city of Ust-Kut.

22.05.2024

Our company, following its management policy, every year improves the technical level, applies new progressive work technologies, and updates the staff of equipment, machines and mechanisms. The photo shows a recently arrived mini-loader for the production base in Omsk, which will soon be used fo… читать дальше

13.05.2024

In the city of Nizhneudinsk, the welding team of Electro Him Zashita LCC implements tasks of varying complexity. Tolerance joints with a diameter of 500 and 150 millimeters, welded by this team, serve as the starting point for replacing pumps at an oil pumping station. Each shining arc, each perf… читать дальше

10.05.2024

Были пройдены этапы от демонтажа опор ВЛ, в том числе и в габарите 110 кВ и порталов к ним, до построения развязки основной и резервной линии уже новых опор ВЛ.
 
Своими мыслями поделился начальник участка: 
"Объект был очень сложным как в техническом плане, по составу работ, так и… читать дальше